Constructioneer

Dedicated to the people who make our built environment better and safer. We tell your stories and celebrate your successes.

Register with us and receive industry news and content only available to subscribers.

Subscribe
Contacts

Indianapolis, IN, USA (HQ)

903 E. Ohio St., Indianapolis, IN 46202

Call: (317) 423-2325

info@acppubs.com

New York Governor Announces Third and Final Phase of $1.7B Hunts Point Access Improvement Project Now Underway

NEW YORK, NY — Governor Kathy Hochul announces the latest milestone in the state's $1.7 billion Hunts Point Access Improvement Project. A $446 million contract has been awarded for the third and final phase of the project, and work is now getting underway. This new phase of the project includes the reconstruction of the Bruckner Expressway interchange with Sheridan Boulevard and other improvements that will reduce congestion, enhance bicycle and pedestrian safety, and provide easier access to the Hunts Point Terminal Market. The Phase Three contract, which keeps the overall project on schedule to be completed in the fall of 2025, is part of an unprecedented state investment to enhance infrastructure and connectivity in the South Bronx while also improving the quality of life for residents.

"There is no better example of the important role modern infrastructure can play in ensuring the economic health and well-being of a community than Hunts Point," Hochul said. "The changes we are making to this vital hub for commerce will not only make it easier to transport goods to and from the market, but also improve quality of life for the surrounding neighborhoods by taking thousands of trucks off local streets and providing new recreational opportunities that will further fuel the revitalization of the South Bronx."

Overseen by the New York State Department of Transportation, the $1.7 billion Hunts Point project will provide direct access to the Hunts Point Terminal Market from both the Bruckner Expressway and the new Sheridan Boulevard once fully completed. The market is one of the largest wholesale food distribution centers in the world. More than 78,000 vehicles travel to the Hunts Point Peninsula daily, including 13,000 trucks using local roads, which has contributed to poor air quality in the community.

Phase Three of the project will remove a bottleneck by reconstructing the Bruckner Expressway/Sheridan Boulevard interchange and relocating the entrance ramp to northbound Sheridan Boulevard from the left side of the highway to the right side. The addition of a third lane in each direction of the Bruckner Expressway and the replacement of the Bryant Avenue Pedestrian Bridge, both of which were started in earlier phases of the project, will also be completed. Additionally, the intersection of Hunts Point Avenue and Bruckner Boulevard will be reconstructed to improve pedestrian and bicyclist safety. New signing and pavement markings will also be installed to better direct auto, truck, and pedestrian traffic within the Hunts Point Peninsula.

Additionally, a new 117-spot parking lot with 24 electrical vehicle charging stations, including four rapid charge spots to better accommodate electric vehicles, will be constructed under the Bruckner Expressway and help enhance air quality in the South Bronx.

Hunts Point Access Improvement Project Phase One
The new work builds on the success of the previous two phases of the project. Phase One, which wrapped up in October 2022, provided new and improved access to Edgewater Road in the form of three new ramps: a two-way ramp to Edgewater Road from Sheridan Boulevard and a ramp from eastbound Bruckner Expressway to Edgewater Road. Edgewater Road was also resurfaced, and new traffic signals were installed at Seneca Avenue and Garrison Avenue.
SITECH
Your local Trimble Construction Division dealer
SITECH Northeast
SITECH Allegheny

Garrison Park was transformed with a new shared-use path, landscaping, viewing platforms overlooking the river, and a formal entrance area with a signalized rail crossing and traffic signal, giving residents safer and more seamless access to the Bronx River. Additionally, a new shared-use path was constructed under the Bruckner Expressway to link the new Garrison Park with the existing Concrete Plant Park, with five security cameras installed along the new path to enhance safety for pedestrians and bicyclists while connecting to the Bronx River Greenway.

The Bronx River Avenue viaduct was also rehabilitated, and more than 15,000 square feet of community "Bronx River Open Space" was created under the viaduct. The project also replaced the eastern span of the Bryant Avenue pedestrian bridge over Amtrak/CSX rail lines.

In addition, Phase One replaced four bridges that carry the Bruckner Expressway and Bruckner Boulevard over Amtrak/CSX rail lines.

Hunts Point Access Improvement Project Phase Two
Phase Two of the project, which is ongoing, will rehabilitate 1.25 miles of the Bruckner Expressway between 141st Street and Barretto Street, widening the roadway and providing new entrance and exit ramps that connect westbound Bruckner Expressway to Leggett Avenue. The ramps provide a direct route between the highway network and the Hunts Point Peninsula, including the Hunts Point Food Distribution Center, reducing truck traffic on local streets.

Additionally, a 1.75-mile section of Bruckner Boulevard between Cypress Avenue and Barretto Street will be reconstructed, and 15 local intersections upgraded. Improvements include new or upgraded curbs, medians, sidewalks, crosswalks, and traffic signal improvements. A new, 1.5-mile shared-use path will provide a connection to the 138th Street bike path heading to Randall's Island, Manhattan, and Bronx River Greenway. Three New York City Park islands will also be improved, new trees will be planted, and a new decorative steel fence will be provided along Bruckner Boulevard. Phase Two is scheduled for completion in fall 2023.

SITECH
Your local Trimble Construction Division dealer
SITECH Northeast
SITECH Allegheny
SITECH
Your local Trimble Construction Division dealer
SITECH Northeast
SITECH Allegheny
SITECH
Your local Trimble Construction Division dealer
SITECH Northeast
SITECH Allegheny
SITECH
Your local Trimble Construction Division dealer
SITECH Northeast
SITECH Allegheny